SOLUTIONS

One platform. Different business outcomes.

Fieldsight supports the same construction record across the people who build the network, manage the contract and accept the finished asset. The workflow stays consistent; the business value changes by role and project type.

WHERE FIELDSIGHT IS USED

Every build has the same problem: cables go under before they are documented.

Energy and data infrastructure is one of the fastest-growing parts of that work. Fieldsight has been used for the power-cable trenching in data center, solar park and wind park projects.

Data center

DATA CENTERS

Power and fibre routes before the halls close.

Supply cables, duct routes and earthing go into the ground early and on a tight schedule, while the owner expects a complete as-built record at handover.

  • Supply cable trenches and duct routes
  • Earthing and protection details
  • Depth and photo evidence per section
  • Handover data in the owner’s format
Solar park

SOLAR PARKS

Kilometres of cable trenching across one site.

A solar park is mostly cable in the ground: panel rows to inverter stations, stations to the grid connection. The routes are long, repetitive and easy to lose track of.

  • Cable routes between rows and stations
  • Grid connection and road crossings
  • Earthing and depth documentation
  • Progress tracking across a large site
Wind park

WIND PARKS

Cable runs between turbines, far from the office.

Turbine-to-turbine cable routes and the grid connection cross access roads, culverts and rough terrain, where returning to check the record later is expensive.

  • Cable routes between turbines
  • Access road crossings and culverts
  • Earthing and depth per section
  • Photo evidence tied to each point

Also documented with Fieldsight

Asphalt and reinstatement

Asphalt & reinstatement

Street lighting

Street lighting

Water and utility lines

Water & utilities

Rail infrastructure

Rail infrastructure

Civil engineering

Civil works

The capture and delivery workflow depends on the project requirements, data sources and target system. We confirm the suitable setup before deployment.

BY ROLE

Built for who is on site — and who signs off.

MAIN CONTRACTOR

Control billing, documentation and quality.

See measured work across subcontractors, reduce manual documentation work and catch missing evidence before handover.

  • Measured quantities and invoice evidence
  • Project-wide progress and QA visibility
  • Less documentation-team rework
  • Supported API and NIS data transfer

Calculate the main contractor business case →

EARTHWORKS CONTRACTOR

Document the work as part of building it.

Capture position, depth and evidence while the trench is open, support metre-based documentation billing and reduce return visits.

  • Documentation income tied to built metres
  • Less manual admin and evidence preparation
  • Fewer return visits to completed sites
  • Position, depth and photos in one record

Calculate the earthworks business case →

NETWORK OWNER

Higher construction quality with less supervision.

Receive clearer evidence of what was installed, reduce owner-side follow-up and move through acceptance with fewer unresolved questions.

  • Quality evidence captured before backfill
  • Less owner-side QA chasing and spot-checking
  • More complete handover record
  • Better asset information for the network lifetime

Calculate the network owner business case →

BY NETWORK TYPE

Document the details that matter for each network.

Fiber Networks

Document microduct and cable routes, joints and network structures while the installation is visible. Keep route, depth, photos and as-built evidence together.

  • Microduct and cable routes
  • Joints and network structures
  • Depth and installation evidence
  • Planned route vs. built route

Power Grids

Capture LV and MV cable routes, joints, cabinets and other network structures during construction, with depth and photo evidence linked to the measured location.

  • LV and MV cable routes
  • Joints, cabinets and structures
  • Depth, protection and photos
  • Network-owner handover

Underground & Civil

Record open trenches, installed utilities, measured areas and construction conditions before they are covered or reinstated.

  • Open-trench utility documentation
  • Asphalt and reinstatement areas
  • Construction conditions
  • General civil infrastructure

Map Fieldsight to your project.

Tell us who builds the work, who manages the contract and what the network owner expects at handover. We will show the workflow that fits.